The First Floor Takes Shape

31 Mar

As noted in the previous post (https://wolfestreetproject.com/2012/03/31/transforming-the-first-floor-goals-and-design-plans/), the goal for the first floor is an open-floor plan with a list of specific design elements. The guys began framing the first floor to plan after the second floor was completed.

Framing for the entry vestibule and new stair landing has begun at this point (although, upon review of the plan, the landing wasn’t actually correct, as you’ll see at the end of this post).

A view of the opposite side of the vestibule, where the closet will go:

A view south from the vestibule area:

The guys begin construction of the west “wall,” which consists simply of the pocket door housing and the powder room walls.

As you’ll see in future plumbing posts, the powder room walls are constructed of 2×6 framing, rather than 2×4. They’ll serve dual purpose as dividing walls and a plumbing superhighway to route supply and drain lines from the second floor to the basement.

The finished product:

We’re still struggling with what to do with the brick walls. To get the black coating off and expose them properly, we’ll need to have the surface physically ground down, then the mortar repointed, which will required additional effort and incur additional costs. We’re waiting for a quote on this, then we’ll decide.

Looking north, so you can see both the powder room framing and the framining by the stairs where the AV niche will go. You can also see elements of the mechanical infrastructure, the installation of which we’ll cover in tortuous detail in a future post.

A view of the east “wall” from the north.

Overview of the framing defining the vestibule area. This will be complemented by the knee wall below.

The adjusted landing is shown below. The stair is supposed to come to the center of the newel post, rather than the end, so the guys ripped out what had been constructed and redid the framing and subfloor. They also removed the last tread and two last risers, as well as the cool round trim element that used to be on this side of the newel post. These should be the final portions of the old house that are removed . . .

 
2 Comments

Posted by on March 31, 2012 in Framing, Drywall, Plaster, and Brick

 

2 responses to “The First Floor Takes Shape

  1. mom

    March 31, 2012 at 9:35 pm

    Are you taking votes on the brick question??? Cover it

     
  2. Gina Ziegler

    April 1, 2012 at 8:54 pm

    Kev,
    Being that the powder room is going to be petite… maybe the expense to clean the brick won’t be worth the cost and time…not a sermon..just a thought!
    Everything looks great!

    Gina

    but Scott said remember NO regrets!!

     

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

 
%d bloggers like this: