The day after foam insulation was adhered to the insides of the horizontal exterior spaces, the sub was back to install batt insulation between vertical framing members at the back of the house.
Here’s the kitchen after this stage:
Looking southeast to the wet bar and pantry area (you can also see the isynine insulation at the joist ends in this shot):
Master bedroom looking east:
And looking west (I’m sure it’s incredibly exciting see not one, but both views . . .):
The final stage – cellulose insulation for sound attenuation – is next.